(1)建議靠墻或靠墻安裝該裝置。安裝基礎(chǔ)平面要求平整,基礎(chǔ)槽鋼的水平誤差為1/1000,總長度偏差為3mm。
(1) It is recommended to install the device against the wall or against the wall. The installation foundation plane is required to be flat, the horizontal error of foundation channel steel is 1/1000, and the total length deviation is 3mm.
(2)當(dāng)設(shè)備到達目的地時,檢查包裝箱是否完整,或者當(dāng)設(shè)備沒有立即安裝時,將其存放在干燥干凈的地方。
(2) When the equipment arrives at the destination, first check whether the packing box is complete, or if the equipment is not installed immediately, store it in a dry and clean place.
(3)建議使用8.8級張力墊圈對所有導(dǎo)電部件進行螺栓固定。
(3) It is recommended to bolt all conductive parts with Grade 8.8 tension washers.
(4)連接好電纜,裝置底部應(yīng)封閉,防止小動物爬進機柜造成短路事故。
(4) Connect the cables, and the bottom of the device should be closed to prevent small animals from climbing into the cabinet and causing short circuit accidents.
(5)裝置安裝或調(diào)整后,應(yīng)在投入運行前進行以下檢查和試驗。
(5) After installation or adjustment of the device, the following inspections and tests shall be carried out before putting into operation.
檢查設(shè)備中電氣設(shè)備和控制線路的安裝是否符合工廠圖紙要求。
Check whether the installation of electrical equipment and control circuit in the equipment meets the requirements of factory drawings.
用手動操作各種開關(guān),應(yīng)操動靈活,無異常和卡軋現(xiàn)象。
Manually operate various switches, which shall be flexible and free from abnormalities and jamming.
(3)檢查機械聯(lián)鎖機構(gòu)、電氣聯(lián)鎖裝置動作是否正確可靠,應(yīng)符合系統(tǒng)要求。
(3) Check whether the mechanical interlocking mechanism and electrical interlocking device operate correctly and reliably and meet the system requirements.
(4)檢查主電路和控制電路的絕緣電阻是否符合規(guī)定要求。
(4) Check whether the insulation resistance of the main circuit and control circuit meet the specified requirements.
檢查裝置內(nèi)設(shè)置的電氣設(shè)備的接觸是否良好,是否滿足該電氣設(shè)備自身的技術(shù)條件。
Check whether the electrical equipment set in the device is in good contact and meets the technical conditions of the electrical equipment itself.
檢查裝置內(nèi)部是否有異物,各部件的安裝螺絲是否松動。
Check whether there are foreign matters inside the device and whether the mounting screws of each component are loose.
That's all about the installation, use and maintenance of MNS low-voltage drawer cabinet. If you have any doubts or needs, please visit our website http://www.26huojia.com consulting service