高低壓成套設(shè)備安裝需要注意哪些事項(xiàng)?

發(fā)布時(shí)間:2023-07-24 來(lái)源:http://www.26huojia.com/ 瀏覽量:

1.安裝時(shí),配電柜應(yīng)按照施工圖的布置順序放置在基礎(chǔ)鋼筋上。單獨(dú)的機(jī)柜可調(diào)節(jié)機(jī)柜表面和側(cè)面的垂直度整個(gè)問(wèn)題可以通過(guò)添加墊片來(lái)解決,但不超過(guò)三個(gè)墊片,并且焊接牢固。放置一排機(jī)柜中的每個(gè)單元后,調(diào)整PDC的水平度和面板偏差。應(yīng)進(jìn)行調(diào)整以滿足施工規(guī)范的要求。
During installation, the distribution cabinet should be placed on the foundation steel bars in the order shown in the construction drawings. The verticality of the surface and sides of the individual cabinet can be adjusted. The entire problem can be solved by adding gaskets, but not more than three gaskets, and the welding is firm. After placing each unit in a row of cabinets, adjust the levelness and panel deviation of the PDC. Adjustments should be made to meet the requirements of construction specifications.
2,安裝應(yīng)嵌入盒子中,安裝面板應(yīng)與墻壁齊平;壁掛式配電柜可以通過(guò)膨脹螺栓固定在墻上,但空心磚或燕尾螺栓應(yīng)預(yù)埋在砌塊墻上或用方頭螺栓固定。調(diào)整PDC后,在PDC主體上安裝螺栓并擰緊鋼筋。
2. The installation should be embedded in the box, and the installation panel should be flush with the wall; Wall mounted distribution cabinet can be fixed on the wall by expansion bolt, but Concrete masonry unit or dovetail bolt shall be embedded on the block wall or fixed by square head bolt. After adjusting the PDC, install bolts on the PDC body and tighten the steel bars.
3.高低壓成套裝置接地注意事項(xiàng)如下:每個(gè)PDC都連接到基礎(chǔ)鋼上。銅電纜可用于將PDC中的PE排連接到接地螺栓。根據(jù)連接情況,必須添加彈簧墊圈以防止松動(dòng)。每個(gè)柜門(mén)應(yīng)使用銅編織線牢固地連接到PE排。
濟(jì)南機(jī)箱機(jī)柜
3. The grounding precautions for the high and low voltage complete equipment are as follows: each PDC is connected to the foundation steel. Copper cables can be used to connect the PE busbar in the PDC to the grounding bolt. According to the connection situation, spring washers must be added to prevent loosening. Each cabinet door should be securely connected to the PE busbar using copper braided wire.
4.將配電柜頂部連接到母線上,并注意按要求擰緊母線配套扳手,接觸面應(yīng)涂上中性凡士林。在配電柜之間連接母線時(shí),注意母線是否離其他設(shè)備或外殼太近,并注意正確的相位。
4. Connect the top of the power distribution cabinet to the bus, and pay attention to tightening the bus matching wrench as required. The contact surface should be coated with neutral Vaseline. When connecting busbars between distribution cabinets, pay attention to whether the busbars are too close to other equipment or enclosures, and pay attention to the correct phase.
5.控制線校準(zhǔn)后,將每條芯線形成一個(gè)圓圈,并用鍍鋅螺釘、吊環(huán)和彈簧墊將其連接到每個(gè)接線板上。通常,條帶的每側(cè)各有一根,每個(gè)端子有一根電線,再Z兩根電線,然后在兩根電線之間加一個(gè)吊環(huán)。多股電線應(yīng)鍍錫,不得斷裂。
After the control wire is calibrated, form a circle for each core wire and connect it to each terminal block using galvanized screws, lifting rings, and spring pads. Usually, there is one wire on each side of the strip, one wire at each terminal, and then two wires, and a lifting ring is added between the two wires. Multiple wires should be tinned and not broken.
6、控制電路檢查:檢查電路是否因運(yùn)輸?shù)纫蛩囟蓜?dòng),并擰緊,檢查電氣元件是否損壞。
6. Control circuit inspection: Check whether the circuit is loose due to transportation and other factors, tighten it, and check whether the electrical components are damaged.